Thursday, February 3, 2011

My Attempt at Project Management: The Big List (with Updates)

Tasks
Notes
Completion?
Anticipated date of completion
Front Porch & Yard

Ceiling Completion

*

Plants

*

Remove ugly thermostat

*

Add stones

*

Bench
Found rockers instead @ Big Lots
*

Gutters: cleaning & straighten

*
Welcome mat
Replace mailbox & address #'s
*
*





Cushions for swing
Ouch!  Costly!
*


Garage & shop
Sort boxes in garage

*

Sort boxes in shop

This can wait til sale

? Repair cement
Realtor says NO!
*


Entry

Take down coat hanger

*

Paint

*

Mirror/wall hanging
Bring from my home
*
Re-hang closet cover

*
Repair front door scratches (inside)
Add polyurethane

 2/27 (C)
? Move light fixture
No...leave in place.  Looks ok with new paint.
*


Stove Landing

Entry table

*

Paint

*

Valance
  No. Will not use window treatments
*
Fire place tools
No.
*
 
Wood basket
No.
Stacked wood outside.
*
Mirror/wall hanging

*

Living Area

Move couch

*

Add chair
Move chair from my office
*
Paint

*

Move furniture out

*
Mirror/wall hanging

*

? Replace light fixtures
No. Leave as-is. Looks ok with paint.
*

Repair extruding phone wires


2/27 (R)
Lamps

*


Downstairs Bath

Dry wall

*
Paint walls & ceiling

*
Shower curtain

*
Wall hanging
Goodwill! $2.99!
*

Move mirror up ~ 2 inches & reinstall fan cover
 After painting
*
 
Soaps, towels, candles
*


Downstairs Bedroom

 Drywall

*
Paint

*

Repair window insulation & trim

*

Remove curtains

*
New carpet

*

Set up Day bed and move dresser back


  2/27 (C)

Kitchen

Repair small holes with screen & spackle
*

Repair small flooring area

*
Dry wall

*

Paint

*

Paint laminate counters
Purchased
1 top coat remaining
 2/27 (C)
Reassemble cabinetry
Ron
*
? Stain cabinets
No
*

Valance
Decided against window coverings.
*

Set up mud room near back door

*
? Add another cabinet

*

? Replace light fixtures
No
*

Paint inside door

*


Solarium Right

Lamps

*

Door strips

*

Paint doors

*

Trim painting door frame



Light fixure (high by window)
 Need to purchase; Ron will replace
*

Light fixture (by patio door)
 Need to purchase

 2/27 (R)
Handles to crawl space
 Need to purchase; Will use nylon handle
At our convenience
 
Hang large mirror
No.  Will not use mirror.
*

Move hutch into this area

*


Solarium Left

Lamps

*

Door strips

*

Trim painting door frame



Light fixure (high by window)
 Need to purchase; Ron will replace
*
Hang large mirror
No. Will not use mirror.
*

Paint doors

*

Paint wicker chair/loveseat

*
 
New cushions for wicker
*
 

Stairwell
Paint walls

*

New Carpet stairs & landings

*

Paint stairs

*
 
Replace doorbell
Purchased
*
Replace sconces
No. leave As Is
*
 

Upstairs landing
Painting

*

Master Bedroom
Repair crack in ceiling

*


Upstairs Bathroom
Repair drywall & texture
*
Paint walls & ceiling

*
Drywall inside washer area

*
Re-hang cabinetry

*

Mirrors x 2

*

Light fixtures x 2

*

Shower curtain
*
Counter soaps, towels, candles, wall hanging
*

Other bedrooms
Remove wall hook; scrape child's door
Need to paint this room at our convenience.

 2/27 (R)

 CELEBRATE!!


3/1

6 comments:

  1. Updated 2/8/11 after weekend painting extravaganza.

    ReplyDelete
  2. Updated 2/18. We are getting closer!

    ReplyDelete
  3. Updated 2/24. We also stacked wood in the yard yesterday.

    ReplyDelete
  4. Did the polyurethane hide the door scratches? Our door has a bunch from the dogs who lived here previously. It's a very poly-heavy wood door. Maybe that would help!

    Oh, and good job!

    ReplyDelete
  5. It did in the guest bedroom. I've only done the trim in 3 rooms, so far. I'll get to that on Sunday and let you know. I'll take some pictures.

    ReplyDelete